----- Forwarded Message ----- From: RIDOT Communications <heidi.gudmundson at dot.ri.gov>To: Sent: Friday, October 29, 2021, 01:01:34 PM EDTSubject: Sunday is Halloween
| |
|
|
|
|
|
|
| |
|
|
|
| |
|
|
|
|
| |
|
|
|
| STAY CONNECTED
RIDOT's Homepage
Weekly Travel Advisories
Customer Service |
|
|
| |
|
|
| |
|
|
| | |
| | |
Good afternoon,
As Sunday is Halloween, and more pedestrians will be out on the roads, be extra mindful of trick-or-treaters.
Be aware, drive with care and please slow down. |
|
|
| _ |
|
|
|
| |
|
|
|
| |
|
| Bridge Group 1, Providence |
| |
| We’ve completed our paving operations along I-95 so motorists should experience a smoother riding surface. Overnight lane closures for pier and steel repairs at both the Broadway and Broad Street bridges are scheduled as is weekday deck and sidewalk work. |
|
| |
|
|
|
| _ |
|
|
|
| |
|
|
|
| |
|
| Bridge Group 32, Cranston/Providence |
| |
| Overnight closures of the bridge ramps from Route 10 South to I-95 North and I-95 North to Route 10 North may be required, Sunday-Thursday nights from 9 p.m. to 6 a.m. for concrete placement. Please follow signed detours. Ongoing repairs at both bridges will require overnight and weekday alternating lane closures in both directions of I-95 at the Route 10 overpass. Motorists can anticipate weekday alternating lane closures on Elmwood Avenue under I-95 for micropile installation in advance of our replacement of the Elmwood Avenue Bridge next summer. |
|
| |
|
|
|
| _ |
|
|
|
| |
|
|
|
| |
|
| Broad Street Regeneration, Pawtucket/Central Falls/Cumberland |
| |
| Our weekday improvements continue along Broad Street. Temporary daytime detours are expected for ongoing drainage work in Cumberland, and minor traffic impacts for curbing and sidewalk installations in Cumberland, traffic signal work in Pawtucket, Central Falls and Cumberland, and drainage structure adjustments in Central Falls. |
|
| |
|
|
|
| _ |
|
|
|
| |
|
|
|
| |
|
| East Bay Bike Path Bridges, Barrington/Warren |
| |
| Temporary Bike Path
Weekdays from 7 a.m. to 5 p.m., RIDOT is providing police details and flaggers to make sure children crossing to go to school can do so safely at the designated crosswalks at both the Barrington and Warren bridges. In addition, we will have police details in place this Sunday to assist Halloween trick-or-treaters with crossing both bridges from 4 p.m. to 11 p.m.
Motorists should expect alternating one-way traffic on Route 114, from Sowams Road to Crescent Road, for removal of the two-bar railing at the Warren Bridge, Sunday and Monday nights from 8 p.m. to 5 a.m. During daytime hours behind barrier, we will continue to assemble safety rail and begin building the boardwalk flooring at the Barrington Bridge.
Long-Term Plan
We are preparing the final scope of work for the RFP and working with National Grid to reduce the scope of their utility work. Once we have reached an agreement with National Grid, we will be ready to send out the RFP. |
|
| |
|
|
|
| _ |
|
|
|
| |
|
|
|
| |
|
| Henderson Bridge, East Providence/Providence |
| |
| Steel demolition over the Seekonk River for two bridge spans will continue as will pile driving at one of its piers and backfilling at the new Waterfront Drive. Both the east and west abutments will see activity including rebar installation and excavation/prep work prior to pile driving, accordingly. |
|
| |
|
|
|
| _ |
|
|
|
| |
|
|
|
| |
|
| I-95 North Viaduct, Providence |
| |
| Various ramps at the Exit 22 interchange and lanes within the project area in both directions of I-95, as well as portions of West Exchange Street, will be closed overnight for demolition of the old I-95 South viaduct and median work. Portions of Park Street remain closed for utility work. Please follow signed detours. In addition, weekday bridge painting requires alternating lane closures on Charles and Ashburton streets. |
|
| |
|
|
|
| _ |
|
|
|
| |
|
|
|
| |
|
| Pell Bridge Ramps Phase 2, Newport |
| |
| Overnight paving is scheduled at the roundabout and weekday excavation for drainage and sidewalks along JT Connell Highway and Admiral Kalbfus Road. Daytime bridge construction will continue along Route 138 behind barrier at the three bridge overpasses which will require temporary lane shifts along Third Street and JT Connell Highway as needed. Police and flaggers remain on site to direct traffic as necessary and all work is weather dependent. |
|
| |
|
|
|
| _ |
|
|
|
| |
|
|
|
| |
|
| Route 6/10 Interchange Reconstruction, Providence |
| |
| We need to close Harris Avenue over Amtrak to set steel at the Harris Avenue Bridge, Sunday-Thursday nights from 9 p.m. to 5 a.m. Please follow signed detour. Weekdays from 6:30 am.-2:30 p.m., we’ll have alternating lane closures on Route 10 South, from the 6/10 split to Union Avenue, for various activities including retaining wall construction at the new Route 6 West on-ramp from Route 10 South, and drainage installation throughout the Route 10 median. |
|
| |
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
| |
|
|
|
| |
|
| October 29, 2021 |
|
|
|
| |
|
|
|
| Department of Transportation, Two Capitol Hill, Providence, RI 02903 | www.ridot.net |
|
|
|
| |
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
| RIDOT | Two Capitol Hill, Providence, RI 02903 |
|
|
|
|
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://sna.providence.ri.us/pipermail/summit_sna.providence.ri.us/attachments/20211029/c85e784b/attachment.htm>
More information about the Summit
mailing list